Amethyst

About the project

Our first battery storage project in Zuid Holland, the Netherlands, boasts a 45 MW capacity with a 2-hour duration. Through collaboration with local authorities and innovative modular designs, we optimized space utilization and streamlined the permitting process. Grid connection is secured, and the project is on track for completion by early 2026, positioning it as a key contributor to regional energy stability. Construction is well on its way, with the civil works being prepared for the placements of the first batteries in Q2 2025.

Installed Capacity

45 MW

Duration

2hrs

Location

Zuid Holland (NL)

Grid

Applied

Land

Secured

Permit

Granted

COD

Early 2026

1 / 6

Civil Works in progress January 2025

Project Overview

Construction started in the fall of 2024.

Battery

The battery, consisting of 144 Fluence cubes, has a capacity of 90MWh and will on average store enough energy supply equivalent for 21,500 households per day.

Location

Utility-scale BESS is being constructed in the port area of Dordrecht, on a 6000m² site, x distance from the Dordrecht substation.

Congestion

Our market access partner will optimize the battery to maintain this balance without increasing local congestion.


Partners

Equity

  • Macquarie Capital
  • EPICo² Fund

Debt finance

  • ABN AMRO Bank N.V.

Market access

  • Eneco

BESS supplier

  • Fluence

Balance of Plant

  • Equans

Owners engineer

  • Ventolines

Market forecast

  • EnAppSys

DSO

  • Stedin

Let's talk about projects