Saphire
About the project
Installed Capacity
400MW
Duration
4hrs
Location
Brandenburg (GE)
Grid
Applied
Land
In talks
Permit
Preparing Permit
COD
2028






1 / 6
Let's talk about projects
Saphire
About the project
Installed Capacity
400MW
Duration
4hrs
Location
Brandenburg (GE)
Grid
Applied
Land
In talks
Permit
Preparing Permit
COD
2028
1 / 6
Let's talk about projects